Fuel tank work is done. Just need to extend the fuel lines and wires on it.
Manifold is mostly done. The 4 runners are fully welded, need to work on the wastegate now, probably have to use the plasma cutter to get a hole in the collector for it then clean it up with the carbide burrs. I am going to try and drill the hole with my drill press and a hole saw but I am doubtful its going to work. Also plan on making a support bracket for the weight to go back down lower on the block to help with the weight.
This is my planned location for the wastegate, close to the collector.
![]()
Bookmarks