-
Associates Degree
Array
The "to do" list, ever growing and often changing:
Montero rear axle swap and 2"-3" lift (summer)
Install the new cam and hydro rollers soon as the cam gets back (2-4 weeks)
Finish the ignition install and get the new alternator in at the same time (still having issues figuring the regulator wiring)
New radio/speakers (radio died on the way to work this week...)
IFS rebuild (duh?)
Find a damned 2" or 3" body lift kit for this thing...then get it installed (would like to do it same time as the IFS, but not looking good)
Start cleaning up the surface rust/cancer on the body/frame and get some quotes for paint
New radiator
Second fuel tank
Interior (will likely wait til Fall for this)
Build my headache rack (summer)
Tear out the old dash and box with aluminum (Fall, possibly early next year)
Find/fab bumpers I like and get a receiver mounted
Fab a new grille next week or week after, mesh is on the way from Minnesota
Mod for and install my HID kits I have here now, get my LED markers mounted
Get off my ass and put an anti-vibration mounting on my fuel pump before the buzzing drives me nuts
Tags for this Thread
Posting Permissions
- You may not post new threads
- You may not post replies
- You may not post attachments
- You may not edit your posts
-
Forum Rules
Bookmarks