15 Attachment(s)
brake & clutch 85% done....
so i pulled the BS clearance lights that some dumb shite drilled 3 holes x5 lights so x15
holes in the paper thin roofskin. lots of body work up here:
Attachment 22108 Attachment 22109 Attachment 22107
looks much much betterer.
Got the brake booster plate cut out and the mitsu logo too:
Attachment 22110 Attachment 22111
Attachment 22113 Attachment 22114 Attachment 22112
And the plate re-enforcements and clutch support all welded in place, then a quick grind
and some primer until i can prep the whole cab and paint the floors, firewall, and jams.
Attachment 22116 Attachment 22117 Attachment 22120
Attachment 22119 Attachment 22118 Attachment 22121
i still need to make two bosses to bolt the tabs on top of the brake pedal assembly to, but i haft to wait
until I patch the old blower motor intake hole, because one of the tabs is under that hole at present...
i gotta go to an appointment at 9am, so im done for the night/morning. ill be back at it later on.
hopefully that steering box shows up in the next few days. im ready for it. :)